FAQ: How long does it take to install a composite wear pad?

On average, a wear pad should take no more that five minutes to install using entry-level personnel. Our wear pad installation instructions are nine steps and one page long. Our two-part epoxy system is housed in a two-part cartridge that is placed in a two-part epoxy applicator and dispensed through a static mixing nozzle. Once again, we use this system to minimize the occurrence of human error. Most two-part epoxy systems use two containers and are mixed by hand using an exact mix ratio that can easily be mixed incorrectly. Our system is as easy as squeezing a caulking gun.

Updated on January 20, 2018

Was this article helpful?

Related Articles